The paint fix will be later, it turns out. (Probably Friday of this week or early next.)

Instead, we’re getting the pipes for the in-floor heat. Cool (ha!) stuff:

p9190001.jpg

p9190004.jpg

p9190002.jpg

Just because I wanted to see what the insulation looked like down in the crawlspace and I saw a chance, I poked the camera down that hole and took a picture:

p9190003.jpg

I observe that some of the insulation is not happily up in the floor. Will have to note that for the contractor.

In the basement, nifty control stuff is getting put together:

p9190005.jpg

And where the other ends of those tubes come out:

p9190006.jpg