Wed 19 Sep 2007
The paint fix will be later, it turns out. (Probably Friday of this week or early next.)
Instead, we’re getting the pipes for the in-floor heat. Cool (ha!) stuff:
Just because I wanted to see what the insulation looked like down in the crawlspace and I saw a chance, I poked the camera down that hole and took a picture:
I observe that some of the insulation is not happily up in the floor. Will have to note that for the contractor.
In the basement, nifty control stuff is getting put together:
And where the other ends of those tubes come out: